A sweep lets the courses of plain tile curve through the hollow where two slopes meet. The effect is easy to show in a photograph looking up from the gutter. The harder part to see is what happens at the top. Extra courses crowd the head of the sweep and lift the line of the ridge as it approaches the valley.
Consider a drawing with a swept valley on the front of the building and a long, uninterrupted roof plane behind it. From the front, the rising ridge follows the tilework. From the back, the top of the tiling is still drawn straight. The two elevations now describe different heights for the same line of ridge tiles. That discrepancy affects what the roofer must build and what the owner will see from the rear.
Follow the head of the valley on the plan
The UK Roof Tile Association illustrates the traditional detail where equal roof pitches meet at 45 degrees or steeper. At a main ridge it describes pairing the sweep with a corresponding valley behind it. Without that counterpart, considerably more exposed leadwork can be needed to close the gap. A dormer ridge that meets the field partway up a larger slope presents a different opportunity. Courses above the junction can absorb the curve.
Ask for a section along the ridge and a view of the far slope before accepting a sample of the sweeping tilework. Mark where the extra courses begin, how they finish, and where metal will be visible. If the design calls for a level main ridge and a plain rear slope, settle the valley choice on the drawings before pricing. The guide to tile roof valleys gives background on the junction itself.
